Maskell Robbins Your HDPE Pipe Specialist
MR Wrap
Prepare and level the pipe surface. Remove any butt welds, grind or plain the two pipe ends parallel 
prep center Attach and center the MR Wrap.
Band MR Wrap with ratchet clamps or chains and apply pressure to close the wrap
band electrical connections Attach electrical connections, and increase pressure during heat cycle
Completed repair or connection 
completed repair